JEM Midgley
Saturday, 19 April 2008
Iain does the Study flooring
Well, Iain has been doing a st
ellar job with the underfloor heating/flooring in the study-project. All took about a week, doing a bit each evening.
I can't wait for the bedroom to be done now!!
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment